Swimming Pool Construction Brisbane

With your design finalised and documentation approved, your project is now in the capable hands of our construction team. At Brisbane Pools & Landscapes, we bring precision, planning and care to every phase of your build. We combine industry-best construction methods with clear communication and consistent quality.

From initial site establishment to the final touches, we’re focused on delivering a stress-free experience and an exceptional result.

1.

Site Establishment and Preparation

2.

Excavation and Base Works

3.

Structural Works: Steel, Formwork and Shell

4.

Plumbing, Filtration and Electrical Installation

5.

Tiling, Coping and Surface Finishes

6.

Internal Lining, Fencing and Compliance

7.

Handover and Orientation

Phase One

Site Establishment and Preparation

Before physical works begin, we carry out a detailed pre-start review and confirm all documentation, approvals and selections. Our team also coordinates:

We then establish the site, which may include temporary fencing, safety signage, material drop and laydown location, access matting, and protection of existing structures or landscaping.

Phase Two

Excavation and Base Works

Excavation is carefully managed to match the approved design. Our team re-confirms the final pool position and levels on site before any digging begins. Spoil removal, temporary ramps and machinery access are all coordinated to minimise disruption.

At this stage, you’ll see your project physically take shape as the groundwork begins.

Phase Three

Structural Works: Steel, Formwork
and Shell

Structural Works: Steel, Formwork and Shell

Once excavation is complete, we install steel reinforcement and formwork as per engineering specifications. These elements are inspected by qualified structural engineers before any concrete is applied.

The sprayed concrete shell is then installed to create the core structure of your pool. This shell complies with Australian Standards and is designed to last for decades.

A 28-day curing period follows to ensure structural integrity and surface stability before finishes are applied.

Phase Four

Plumbing, Filtration and Electrical Installation

While the shell is curing, we complete:

We work with premium equipment suppliers and install with long-term serviceability and efficiency in mind.

Phase Five

Tiling, Coping and Surface Finishes

Once the shell has cured, we move into detail work. This includes laying coping tiles, installing waterline tiles (if applicable), and preparing surfaces for internal finishes. Every finish is installed by trusted tradespeople with proven experience and attention to detail.

Phase Six

Internal Lining, Fencing and Compliance

Before the final interior finish is applied, your permanent pool fencing must be installed and certified in accordance with Queensland regulations. Once this is complete, we proceed with:

Phase Seven

Handover and Orientation

With your pool filled and fully operational, we schedule a project handover walkthrough. During this session, we: